preloader-matrix
Case Study
Case Study

case study

See below how Monakko Developments will build your dream home

Demo

Need to remove or alter the existing property

Concrete

Pour concrete according to the specifications

frames

Frame the house based on architectural drawings

Bricks

Lay bricks to make the infrastructure stronger

insulations

Place insulations inside of the frame to control the heat

Drywall

Install drywall on top of the insulations along the frame

After the drywall is placed, the floors will be laid, the walls painted and any other minor imperfections fixed.  You’re ready to move into your happily ever after.

647-262-2575
info@monakko.ca
Open: Mon – Sat : 09:00 am – 05:00 pm